Our Projects

We have a strong pipeline of projects on 3 continents with up to 7,500MW of gas based power generation​.

Six projects in development, all with unique delivery requirements including:

Large scale CCGT to grid generation​.

Transhipping of LNG to satellite locations​.

Small scale LNG distribution.

Floating Storage (FSU) & Floating Storage & re-gasification (FSRU) up to 6 Terminals.

LNG to Gas solutions​.

Implement weather design & management​.

Base projects all have significant future expansion capabilities​.

All projects open ‘gas’ market for industrial, commercial and domestic applications.

Visayas | Philippines

The establishment of a flexible LNG resource that can be used to both generate power and supply gas in bulk or small scale (ssLNG Projects)  to other strategic locations​.

  • LNG import terminal with a total capacity of 1,200MW​;
  • Strategically located in the central Philippines​;
  • Co-located Combined Cycle Gas Turbine (CCGT) plant to provide power to the local and national grids​;
  • Onward transhipping capability to support the establishment of grid scale CCGT generation;
  • Central LNG distribution hub to deliver and support small scale LNG (ssLNG) plants distributed at locations across the Philippines​;
  • Using the latest technologies of ISO containers as a “plug-and-play” for power generation substituting old diesel generation​.
  • LNG import terminal with a total capacity of 1,200MW​;
  • Strategically located in the central Philippines​;
  • Co-located Combined Cycle Gas Turbine (CCGT) plant to provide power to the local and national grids​;
  • Onward transhipping capability to support the establishment of grid scale CCGT generation;
  • Central LNG distribution hub to deliver and support small scale LNG (ssLNG) plants distributed at locations across the Philippines​;
  • Using the latest technologies of ISO containers as a “plug-and-play” for power generation substituting old diesel generation​.

India

A focus on a strategic west coast terminal capable of supplying both the immediate re-gas and future power needs of industrial corridors around Mumbai​.

Agreement signed with Dighi Port for a terminal site and future CCGT​.

  • All permitting in place for a 5m mtpa LNG terminal as well as direct access to existing national gas pipeline network.
  • Focus on an initial 1.5m – 2.0m mtpa re-gas tolling contract followed by the development of a range of LNG to power assets to support the future needs of industry, transport and the wider infrastructure being developed around Mumbai.
  • Sub-concession Contract includes a 10 hectare site for the future development of a 300+ MW CCGT IPP, negotiations ongoing for the PPA.
  • Ongoing negotiations for a 2nd FSRU with Cargo Group for their “Nargol Port” development, to serve as a tolling LNG Terminal.​

Africa

First LNG terminal located in West Africa supporting private industry as well as the capability to supply base load and distributed power across the region​.

A challenging continent in need of strong IPP where LNG to Power will play a big role. Resero Gas is looking at these opportunities with strong partners.​

A challenging continent in need of strong IPP where LNG to Power will play a big role. Resero Gas is looking at these opportunities with strong partners.​

  • Base project being developed in partnership with a private minerals developer to support new mining operations.
  • Option to locate terminal in an existing port in Sierra Leone creating a central asset for the needs of the wider region.
  • Location and project feasibility completed for a terminal site in Maputo, Mozambique (on hold).​
  • Strong local partners working on local development.
  • Expectation that the wider macro environment in country will improve over the next 2 years allowing the project to proceed.

Nacala | Mozambique

Working with Partners to bring the best Technical & Economical Solutions for IPP.

KUIKILA LDA. promoter of the IPP-300MW CCGT, created SPV-NOR ENERGY to develop the project.​

Resero Gas has entered into an exclusive agreement to supply LNG and all the infrastructures to deliver Gas at a metering point that will supply the Power Generation Plant CCGT, including FSU, Re-gasification Unit, Intermediate Storage Unit, Pumps, etc.​

  • The LNG Terminal in the Port of Nacala – North of  Mozambique.
  • The CCGT is located few Km away – the connection is made  via a NG Pipeline.
  • The LNG Terminal consists of a FSU – Floating Storage Unit which is mainly a LNG vessel stationary in a Jetty.
  • An Intermediate storage and regasification unit are located onshore providing the gas to the CCGT power plant in a closed loop – LNG to Power. Alternatively the regas can take place in a barge next to the FSU.
  • A cryogenic piping, over the jetty, deliver LNG to an intermediate storage and to the regasification unit. The NG produced will be injected in the Pipeline feeding the power plant.

Greece

Creation of a ‘Virtual Gas Network’ delivering LNG for power generation across islands. Flexible systems allow dedicated design and implementation​.

Working with a local partner we are in the process of submitting an application to PAE | RAE for a LNG Terminal to serve ssLNG and small Power Generation to 7 Islands with the largest being 135MW​.

Working with a local partner we are in the process of submitting an application to PAE | RAE for a LNG Terminal to serve ssLNG and small Power Generation to 7 Islands with the largest being 135MW​.

Shipping Logistics

Staging Terminals

Local Logistics

Belize

Small Scale LNG Supply and 45 MW Power Project.

Small Scale LNG Supply and 45 MW Power Project.

Phase 1

36 MW TM2500 gas turbine at Mile 8
LNG Supply
  • 36 MW gas turbine at existing BEL Mile 8 facility
  • TM 2500 pre-ordered and located at Port of Houston
  • Brownfield project to existing BEL substation infrastructure
  • Small scale LNG fuel source from US Gulf Coast
  • US Exim guarantees 80% of GE TM2500 cost
  • Working with JP Morgan Chase and EPPF for project finance
  • Total cost – US$160 MM
  • PPA – Take or Pay Capacity Charge/LNG purchase

Phase 2

50 MW PV and 30 MW battery at Mile 12
Hybrid Power
  • 50 MVA PV Solar facility Mile 12 facility (phase 2a)
  • 30 MW (0.5 hr.) Battery
  • Greenfield project
  • Land secured
  • 18 months EPCI to COD
  • Total cost – approximately US$90 MM
  • PPA – Take or Pay Fit in Tariff

Phase 3

Dangriga, LNG Bunkering Facility
IMO 2020 Compliant
  • LNG Bunkering facility at Dangriga
  • 30,000 m3 onshore storage tank and re-gas facility
  • Jetty-less ATS loading facility
  • 3,000 m3 LNG bunker vessel (charter)
  • 30,000 m3 LNG Carrier (charter)
  • Greenfield project
  • Land secured
  • Mid-point of Belize to service Belize City and Harvest Caye
  • 24 months EPCI to COD
  • 20 MW Combined Cycle Gas Turbine
  • US Exim guarantees 80% of GE TM2500 cost
  • Blackrock interested in project finance
  • Total cost – approximately US$400 MM
  • PPA – Take or Pay Generation Charge 25 years
  • LNG Bunkering contract with Cruise Liners

Other Countries

We have been looking at other opportunities for the concept of LNG to Power model with ssLNG potential in the following geographies:

Caribbean Islands

Preliminary contacts for a ssLNG distribution associated to IPP’s developments.

Croatia Islands

Established conversations with LNG Croatia Terminal at Krk.

Liberia and Cameroon

Ongoing conversations to establish a FSU and regasification to supply a CCGT and break-bulk to other opportunities connected to Mining Exploration.

Greek Islands

Ongoing project at present.

Disclaimer

Resero Gas has conducted either preliminary or detailed desktop studies and/or pre-feed studies for all the projects referred to above.

With Covid-19 there has been significant business interruptions in our endeavours on some of the above projects.

We are restarting our business operations looking at opportunities bringing the accumulated know how achieved during the development of the above projects.

We are also looking at new technologies as well as ESG compliance on new developments.